PROJECT DESCRIPTION

This multi-level Dwelling consisting of concrete and steel structure counter-levered over a gully presented a genuinely difficult site with limited access. The massive project was a 2 year build and was profiled by T.V.N.Z. along with 8 others on Grand Designs NZ.

  • slider 1
  • slider 2
  • slider 3
  • slider 4
  • slider 5
  • slider 6
thumb 1 thumb 2 thumb 3 thumb 4 thumb 5 thumb 6

PROJECT DESCRIPTION

This multi-level Dwelling consisting of concrete and steel structure counter-levered over a gully presented a genuinely difficult site with limited access. The massive project was a 2 year build and was profiled by T.V.N.Z. along with 8 others on Grand Designs NZ.

AWARD WINNING BUILDERS
Maungakawa Residence NZIA 2013
Fastlane Fitness PCA 2015
Vera House, Hamilton NZIA 2021
Manning Street Apartments NZIA 2023
Coombes Residence NZIA 2023
master builder logo